Request for Proposal 
            For 
End-line Evaluation of BRDM&CN PROJECT (KOICA) 
            World Vision Bangladesh (WVB) is hereby inviting Request for Proposal (RFP) from the experienced consultant/Firm for “End-line Evaluation of BRDM&CN PROJECT (KOICA) in Bangladesh” 
            General RFP Guidelines and Instructions: 
            
              
                | RFP Name: | 
                Hiring a Consultant/Firm for “End-line Evaluation of BRDM&CN Project (KOICA) in Bangladesh” | 
               
              
                | RFP    Reference: | 
                WVB-SCM-RFP-0013-08/20 | 
               
              
                | RFP document collection: | 
                Click here to download detail RFP  | 
               
              
                | Proposal    submission: | 
                Separate Technical and Financial proposals shall be sent directly through email in PDF format to: wvb_scm@wvi.org 
                  Maximum file size: 9MB. If mail returned due to over file size, please split the file and send in separate email. 
                  Email Subject: “End-line Evaluation of BRDM&CN PROJECT (KOICA) in Bangladesh”. Shall be mentioned in subject line.  | 
               
              
                | Deadline for the submission of proposals: | 
                Proposals shall be submitted On or before 28th May, 2020 within 1.00 P.M | 
               
              
                | Procurement    Focal Point: | 
                Md. Ziaul Islam, Sourcing Coordinator, World Vision Bangladesh. Email: Ziaul_Islam@wvi.org | 
               
              
                | WVB Contact regarding Technical Specification: | 
                Md. Iqbal Hossain- M&E Officer, BRDM&CN PROJECT (KOICA), Cell# 01718047232 | 
               
             
            WVB reserves the right to accept or reject any or all the proposals in full or part with or without assigning any reason whatsoever. 
            Attachment 1_Mid Term Evaluation 
            Attachment 2_Indicatior Detail Matrix 
            Attachment 3_Project Baseline Survey  |