Career Opportunity
SS Power I Ltd. a joint venture company between S. Alam Group of Bangladesh and Chinese companies, SEPCOIII Electric Power Construction Co., Limited and HTG Development Group Co., is one of the largest investments ever in the private power sector of Bangladesh which currently executing the 2 x 660 MW Coal fired Super Critical Thermal Power Plant at Banskhali near Chattogram, Bangladesh.
To meet immediate requirements, we are looking for O&M professionals of following disciplines.
Sl / No. |
Position |
Vacancy |
Experience |
Education |
1. |
Assistant Manager/ Senior Executive (Procurement) | 2 |
Minimum 3-4 Years’ experience, preferably in power plant. |
B. Sc. – Mechanical / Chemistry |
2. |
I&C Engineer | 2 |
Minimum 5-8 Years’ experience. Should have experience in Steam Turbine / CCPP/ as an I&C Engineer. |
B. Sc. - Electrical |
3. |
DCS Station Engineer | 2 |
Minimum 5-8 Years’ experience. Should have experience in Steam Turbine / CCPP as an I&C Engineer. Should be well conversant with Emerson DCS. |
B. Sc. - Electrical |
4. |
Electrical Engineer | 3 |
Minimum 5-8 Years’ experience. Should have Steam Turbine /CCPP Operational Experience as a Maintenance Engineer. |
B. Sc. - Electrical |
5. |
CHP Assistant Engineer | 1 |
Minimum 3-5 Years' experience as CHP & AHP Engineer. |
B. Sc. - Mechanical |
6. |
Warehouse Keeper | 3 |
8-10 Years' experience as a storekeeper/Supervisor for large Power Plant maintenance preferably in Steam Turbine/CCPP. |
Diploma / Graduate |
7. |
Turbine Fitter | 12 |
8-10 Years' experience in Steam Turbine/CCPP Power Plant as a Fitter of Turbine Maintenance/Erection. |
SSC / Vocational |
8. |
Boiler Fitter | 8 |
8-10 Years' experience in Steam Turbine/CCPP Power Plant as a Fitter of Boiler/HRSG Maintenance/Erection. |
SSC / Vocational |
9. |
CHP Fitter Jr./ Helper | 12 |
8-10 Years' experience in coal Handling System/ Cement Industry as a Fitter in Maintenance/Erection. |
Eight / SSC |
10. |
Electrical Work Foreman | 4 |
8-12 Years' experience in Steam Turbine/CCPP Power Plant as an Electrical Foreman in Maintenance/Erection. |
HSC / Vocational |
11. |
Electrical Technician | 6 |
8-10 Years' experience in Steam Turbine/CCPP Power Plant as an Electrician in Maintenance/Erection. |
SSC / Vocational |
12. |
I&C Work Foreman | 3 |
8-12 Years' experience in Steam Turbine/CCPP Power Plant as a I&C Foreman in Maintenance/Erection. |
HSC / Vocational |
13. |
I&C Technician | 2 |
8-10 Years' experience in Steam Turbine/CCPP Power Plant as an I&C fitter in Maintenance/Erection. |
SSC / Vocational |
14. |
Workshop Fitter | 2 |
8-10 Years' experience as a workshop fitter for various machine-like High-Speed Precision Lathe, Milling, Hydraulic Press. |
SSC / Vocational |
15. |
HAVC Maintenance Technician | 2 |
8-10 Years' experience as a HAVC Technician. |
SSC / Vocational |
16 |
Warehouse Assistant | 6 |
8-10 Years' experience as a store assistant for large Power Plant maintenance preferably in Steam Turbine/CCPP. |
SSC / Diploma |
Total |
70 |
Salary & Benefits:
SS Power I Ltd. offers attractive salary for the deserving candidates with attractive market-based benefits.
Job Location: Banskhali, Chattogram.
Job Type: Full time.
Application Deadline: All applications to be sent through e-mail: resume@sspowerbd.com by 07 July 2024.
In the subject line of the email please write only the name of the vacant position for which you have applied.