
SS Power I Ltd. a joint venture company between S. Alam Group of Bangladesh and Chinese companies, SEPCOIII Electric Power Construction Co., Limited and HTG Development Group Co., is one of the largest investments ever in the private power sector of Bangladesh which currently executing the 2 x 660 MW Coal fired Super Critical Thermal Power Plant at Banskhali near Chattogram, Bangladesh.
To meet immediate requirements, we are looking for O&M professionals of following disciplines.
S L |
Position |
Vacancy |
Experience |
Education |
CHP & AHP Engineer (For Operation) | 1 |
Minimum 5-8 Years’ experience in Coal Handling System Operation/experience as an Engineer in large Conveyor System for Cement or any other Industry. | B.Sc. - Mechanical | |
Boiler Engineer | 2 |
Minimum 5–6 years of experience as a Boiler Engineer in steam turbine or combined cycle power plants (CCPP). | B.Sc. - Mechanical | |
CHP & APH Work Foreman | 1 |
Minimum 8-12 Years’ experience in Coal Handling /Cement Plant as a Foreman of CHP & APH/ Conveyor Syst for Maintenance/Erection. | HSC / Vocational | |
I&C Work Foreman | 2 |
Minimum 8-12 Years’ experience in Steam Turbine/CCPP Power Plant as a I&C Foreman in Maintenance/Erection. | HSC / Vocational | |
Total |
6 |
|
Salary & Benefits:
SS Power I Limited offers attractive salary for the deserving candidates with attractive market-based benefits.
Job Location: Banskhali, Chattogram
Job Type: Full time
Application Deadline:
All applications to be sent through e-mail: project@sspowerbd.com by 07 September, 2025.
In the subject line of the email please write only the name of the vacant position for which you have applied.